A [[coping]] projecting from the [[shaft]] of a [[pier]] above the elevation of high water, used for enlarging the lower portion of the pier and its base, thereby increasing the stability and reducing the foundation pressure.
A [[coping]] projecting from the [[shaft]] of a [[pier]] above the elevation of high water, used for enlarging the lower portion of the pier and its base, thereby increasing the [[stability]] and reducing the foundation [[pressure]].


[[Category:Glossary]]
[[Category:Glossary]]

Latest revision as of 04:27, 28 December 2006

A coping projecting from the shaft of a pier above the elevation of high water, used for enlarging the lower portion of the pier and its base, thereby increasing the stability and reducing the foundation pressure.