Pedestal pile: Difference between revisions

From StructuralWiki
Jump to navigation Jump to search
(Based on Glossary of Bridge Terminology; Chapter LXXX of J.A.L. Waddell's Bridge Engineering (New York: Wiley, 1916))
 
No edit summary
 
Line 1: Line 1:
A patented [[pile]] formed by driving a steel shell into the ground to the required depth, putting in small quantities of concrete, and hammering them down so as to force the concrete into the earth beyond the point of the shell; thus enlarging the end and greatly increasing the bearing area. The shell is afterward withdrawn gradually, as the hole that it made is filled with concrete. If the shell were left in, the method would be far more satisfactory; as the shaft of the pile is liable to be seriously imperfect. Sometimes dubbed a [[club-footed pile]].
A patented [[pile]] formed by driving a steel shell into the ground to the required depth, putting in small quantities of concrete, and hammering them down so as to force the concrete into the earth beyond the point of the shell; thus enlarging the end and greatly increasing the bearing area. The shell is afterward withdrawn gradually, as the hole that it made is filled with concrete. If the shell were left in, the method would be far more satisfactory; as the shaft of the pile is liable to be seriously imperfect. Sometimes dubbed a [[club footed pile]].


[[Category:Glossary]]
[[Category:Glossary]]
[[Category:Geotechnical]]
[[Category:Geotechnical]]
[[Category:Structural Components]]
[[Category:Structural Components]]

Latest revision as of 03:35, 5 August 2007

A patented pile formed by driving a steel shell into the ground to the required depth, putting in small quantities of concrete, and hammering them down so as to force the concrete into the earth beyond the point of the shell; thus enlarging the end and greatly increasing the bearing area. The shell is afterward withdrawn gradually, as the hole that it made is filled with concrete. If the shell were left in, the method would be far more satisfactory; as the shaft of the pile is liable to be seriously imperfect. Sometimes dubbed a club footed pile.